However, its now in and done, Dave has put all the sub floor drains in, and fed the waterpipes under the floor.
(Top) Mick making openings and linking existing brickwork to new blockwork.
(Bottom) Double doorframes from kitchen.
(Top) Delivery of the floor beams.
(Middle and Bottom) The beams in situ, and ready to take blocks. Twin beams are where walls will go.
No comments:
Post a Comment