Saturday 26 January 2008

Real Progress

This month has seen real progess as Dave and co started properly on our barn. January had two main targets, getting all the internal block walls up, and laying the beam and block floor. The walls (and lintels to make door openings) have been miraculously quick, the beam and block has been quite frankly a pain for everyone.

However, its now in and done, Dave has put all the sub floor drains in, and fed the waterpipes under the floor.



(Top) Mick making openings and linking existing brickwork to new blockwork.

(Bottom) Double doorframes from kitchen.



(Top) Delivery of the floor beams.

(Middle and Bottom) The beams in situ, and ready to take blocks. Twin beams are where walls will go.